Mezzanine Floor Manufacturer in Jodhpur – Built Strong for Heavy Use
As a Mezzanine Floor Manufacturer, we design solutions that can take on the toughest loads. Our Mezzanine Floors are built with heavy-duty steel and engineered to stand up to environments where strength can’t be compromised in Jodhpur.
You’ll notice how much more efficient your space becomes once storage and operations are neatly divided. With our Mezzanine Floors, factories and workshops all gain reliable extra space that works as hard as they do.
Mezzanine Floor Dealer in Jodhpur – Smart Storage, Ready When You Are
As a Mezzanine Floor Dealer, we know sometimes businesses need solutions fast. That’s where local availability makes all the difference. Our Mezzanine Floors are ready to be installed quickly, helping you unlock more space without waiting for months in Jodhpur.
It’s often surprising how much more organized a warehouse feels with an extra floor. Even a small mezzanine can completely change how smoothly inventory flows.
Mezzanine Storage Rack Supplier in Jodhpur – Smart Storage With Easy Access
As a Mezzanine Storage Rack Supplier, we create racks that not only add space but also make organization simpler. Our Mezzanine Storage Racks combine shelving systems with mezzanine platforms, giving you double utility in the same footprint in Jodhpur.
From retail stockrooms to large-scale warehouses, these racks help businesses use every inch of available space. You might notice how much smoother stock handling feels when storage is both vertical and easy to reach.
Mezzanine Floor Dealer in Jodhpur – Space That Stays Strong
As a Mezzanine Floor Dealer, we understand that some businesses don’t just need more space—they need space that’s built to last. Our Mezzanine Floors are designed to carry substantial loads and keep operations running smoothly year after year in Jodhpur.
It often helps when your storage doesn’t just create space but also inspires confidence. With our strong, durable designs, you’ll feel the difference in both safety and efficiency.
Specifications — Mezzanine Floors
Spanco manufactures to order, so the figures below are the standard ranges
produced at the Bahadurgarh plant rather than a fixed catalogue size.
Final bay loading is confirmed against your pallet weight, bay width and
level configuration before drawings are issued.
Built to the ranges listed below — sizes are made to your bay.
Standard manufacturing ranges for Mezzanine Floors
Platform height
2000 mm to 5000 mm clear underside
Floor loading
300 kg/m², 500 kg/m² or 750 kg/m²
Levels
Single level (G+1) up to three levels
Decking
MS chequered plate, MS panel or steel grating
Material
Mild steel structural sections
Finish
Powder coated
Construction
Bolted modular, relocatable, no site welding required
Configuration options
Staircase with handrail
Pallet gate or loading bay
Edge protection barrier
Rack-supported or column-supported
Integrated lighting cut-outs
Questions buyers ask before ordering
What floor loading do you build Mezzanine Floors to?
We build Mezzanine Floors to 300, 500 or 750 kg per square metre, with clear platform heights from 2000 mm to 5000 mm. 300 suits light storage and picking, 500 is the usual warehouse choice, and 750 is for heavier stock or where a pallet truck runs on the deck.
What floor loading do you build Warehouse Mezzanine Floors to?
We build Warehouse Mezzanine Floors to 300, 500 or 750 kg per square metre, with clear platform heights from 2000 mm to 5000 mm. 300 suits light storage and picking, 500 is the usual warehouse choice, and 750 is for heavier stock or where a pallet truck runs on the deck.
What floor loading do you build Industrial Mezzanine Floors to?
We build Industrial Mezzanine Floors to 300, 500 or 750 kg per square metre, with clear platform heights from 2000 mm to 5000 mm. 300 suits light storage and picking, 500 is the usual warehouse choice, and 750 is for heavier stock or where a pallet truck runs on the deck.
How much floor area can a mezzanine add?
In a building with enough clear height, a single-level mezzanine roughly doubles the usable area of the footprint it covers. The limit is the clear height available: you need working headroom both below and above the deck, so measure from the floor to the lowest obstruction, which is usually a roof beam, a sprinkler line or a light fitting rather than the roof itself.
How much floor area can a mezzanine add?
In a building with enough clear height, a single-level mezzanine roughly doubles the usable area of the footprint it covers. The limit is the clear height available: you need working headroom both below and above the deck, so measure from the floor to the lowest obstruction, which is usually a roof beam, a sprinkler line or a light fitting rather than the roof itself.
How much floor area can a mezzanine add?
In a building with enough clear height, a single-level mezzanine roughly doubles the usable area of the footprint it covers. The limit is the clear height available: you need working headroom both below and above the deck, so measure from the floor to the lowest obstruction, which is usually a roof beam, a sprinkler line or a light fitting rather than the roof itself.
Should I choose a mezzanine floor or multi-tier racking?
A mezzanine gives you open floor you can lay out freely, put desks or machines on, and change later. Multi-tier racking gives you shelving on several levels, which stores more per square metre but fixes the layout to the rack grid. Choose a mezzanine when you need usable space; choose multi-tier when you need storage density.
Should I choose a mezzanine floor or multi-tier racking?
A mezzanine gives you open floor you can lay out freely, put desks or machines on, and change later. Multi-tier racking gives you shelving on several levels, which stores more per square metre but fixes the layout to the rack grid. Choose a mezzanine when you need usable space; choose multi-tier when you need storage density.
Should I choose a mezzanine floor or multi-tier racking?
A mezzanine gives you open floor you can lay out freely, put desks or machines on, and change later. Multi-tier racking gives you shelving on several levels, which stores more per square metre but fixes the layout to the rack grid. Choose a mezzanine when you need usable space; choose multi-tier when you need storage density.
What floor loading should I specify?
We build to 300, 500 or 750 kg per square metre. 300 suits light storage and order picking, 500 is the usual choice for general warehouse duty, and 750 is for heavier stock or where a pallet truck will run on the deck. Specifying higher than you need adds steel and cost, so it is worth being honest about the real load.
What floor loading should I specify?
We build to 300, 500 or 750 kg per square metre. 300 suits light storage and order picking, 500 is the usual choice for general warehouse duty, and 750 is for heavier stock or where a pallet truck will run on the deck. Specifying higher than you need adds steel and cost, so it is worth being honest about the real load.
What floor loading should I specify?
We build to 300, 500 or 750 kg per square metre. 300 suits light storage and order picking, 500 is the usual choice for general warehouse duty, and 750 is for heavier stock or where a pallet truck will run on the deck. Specifying higher than you need adds steel and cost, so it is worth being honest about the real load.
Is a mezzanine permanent?
No. Ours are bolted modular structures erected without site welding, so they can be dismantled and re-erected elsewhere. On a leased building that is often the deciding advantage.
Is a mezzanine permanent?
No. Ours are bolted modular structures erected without site welding, so they can be dismantled and re-erected elsewhere. On a leased building that is often the deciding advantage.
Is a mezzanine permanent?
No. Ours are bolted modular structures erected without site welding, so they can be dismantled and re-erected elsewhere. On a leased building that is often the deciding advantage.
What do you need to quote a mezzanine floor?
Floor area, clear height to the lowest obstruction, intended loading per square metre, and whether you need a staircase, a pallet gate or edge barriers. A photograph of the space is usually enough to start.
What do you need to quote a mezzanine floor?
Floor area, clear height to the lowest obstruction, intended loading per square metre, and whether you need a staircase, a pallet gate or edge barriers. A photograph of the space is usually enough to start.
What do you need to quote a mezzanine floor?
Floor area, clear height to the lowest obstruction, intended loading per square metre, and whether you need a staircase, a pallet gate or edge barriers. A photograph of the space is usually enough to start.
Can a mezzanine floor be installed in any warehouse?
<p>As long as your facility has sufficient ceiling height (usually 14 feet or more), a mezzanine can be installed. As a <strong>Mezzanine Floor Manufacturer in Delhi</strong>, we provide a site audit to ensure your floor slab can support the additional load.</p>
Is it possible to dismantle and move the mezzanine floor?
<p>Yes. Our designs are nut-and-bolt based (modular), manufactured at our <strong>Bahadurgarh unit</strong>, allowing them to be relocated if you move your business or reconfigure your layout.</p>
Top Racks Manufacturers in Jodhpur — Delivering Quality
Steps of manufacture
How we work
Every rack on this site is made on one line at our own
5000 m² plant in Bahadurgarh.
Nothing is bought in and re-badged, which is why we can answer for the
steel grade, the coating and the bay loading on the same call.
1
Steel coil in
Cold-rolled and hot-rolled coil from TATA Steel and SAIL arrives at the Bahadurgarh plant and is checked against IS 513 and IS 10743 before anything is cut.
2
Punching
Coil is slit to width and punched on the press. Upright perforation pitch is set here, and it is what decides the beam levels you can later move.
3
Roll forming
Flat strip is passed through the forming line and comes out as the finished section — upright, beam or panel — with the stiffening bends that carry the load.
4
Shot blasting
Mill scale and rust are stripped off the formed sections so that paint has clean, keyed steel to hold on to. Skipping this is why cheap racking flakes.
5
Welding and assembly
Bracing is welded to the uprights and beam end-connectors are fitted. Frames are squared on the jig so bays line up on site rather than being forced true.
6
Powder coating
Sections are pre-treated and powder coated, then oven cured. The coat is what stands up to forklift rub, humidity and cold-store condensation.
7
Packing
Uprights, beams and accessories are bundled by bay and labelled, so the right parts reach the right run and nothing is counted twice on site.
8
Delivery and installation
Dispatch runs approximately 2 weeks from order confirmation. Our own team installs and hands over; everything is bolted, so a run can be re-pitched or relocated later.
The Mezzanine Floor range we supply in Jodhpur
Each type below is built at our Bahadurgarh plant and delivered to Jodhpur. Open any one for its specification.